Sunday

13 July 2014



I have decided it is well time for the new kitchen to get attention. I commandeered Jaco to assist me, and we added battens to the old ceiling, The ones I fitted way back were not secure enough. the new ones are 40 *40 mm and screwed to the beams with 100 mm screws. I rented a gib lift and Barco assisted and the boards were fitted easily. I realised I cannot continue to do work on the cornices and half round battens (strips) before all the walls are done. That means I will need to cut the serving hatch and remove the door, as planned. It will also mean I cannot close the door on the job when I do not feel up to it.

Saturday was a very rainy day and I called on Jaco so we could work on his door and door frame he want to fit in his garage to change it to a play room for the kids. That is nearly done now.

Our article did appear in the paper, see attached




1 comment:

  1. Pragtig en mooi. Julle doen wonders en ek is bly dit word raakgesien.
    Enjoy the house and know it was done with love, not only for the building, but for each other as well.

    ReplyDelete