Sunday

20 July 2014

After a long period of inactivity, we rented a "Gib lift" and got Barco to assist. We managed to fit all three of the ceiling panels, as well as the one over the nook formed by the new bathroom wall being moved. We also fitted the Gib on that side.

Next we secured the lintel where the serving hatch will go. Suddenly I realised that we have never secured the studs on the other side, and the Gib is fitted now. Luckily we have a space from 2 m height to 3.4 m  height which was built for access. I removed one of the sarking boards there and secured the studs.

We also started planning the positioning of lights, and had to lay wiring for that. That was easy with the sarking removed, but where the stove will be, we had to remove a Gib panel and lay the wiring.

The next job was to fit the last of the 3.5 m Gib panels, over the lintel where the hatch will go. With a lot of help from Above, Elna and myself managed that. We had to lift it 2 m. That is screwed down now.

Saturday I bought half rounds to replicate the original, and some cleats fir the corners, also as per the original. The plan was to start painting those, but the grandchildren came over and Shaun has been dreaming of a "box car" (kaskar). We selected material and designed the thing, and after he  left I welded a frame. That meant that my work wad not done.



No comments:

Post a Comment