Sunday

22 March 2015

Well, the expected rain has not materialized. The South Island is getting rain, but very little here.

Petrus came and we built the oven unit and fitted a filler of about 70 mm to take up the space between the units. There was a spacer of 40 mm between the edge of the door and the edge of the cabinet, so it fits in as good as anybody can ask for.

I thanked Petrus for all his work, and set him free. I finished the drawer ends and fitted handles. We were lucky to get more of the same as the original black ones.






The wall on the last picture is towards the dining room. Half of that will be reduced to  a convenient height. The counter tops will also need a lot of attention, but we have decided that the floors in the dining room and loving room will be our next priority. Think of me sanding away!







No comments:

Post a Comment