Sunday

2 Novenber 2014

Things are speeding up on our side. The floor of the room on the deck is in and we have cut a hole in the wall on the eastern side for a window that we have bought about two years ago. The window is fitted, We had a problem deciding on the right door to install. I checked our existing supply, and was not satisfied. In the end we removed the door and frame between the old kitchen and the laundry. It is a nice solid Rimu door, although it is painted. Doors and window fitted, I started on the insulation in the outer walls and installing plasterboard with Elna's help.  The last plasterboard was fitted yesterday, although not screwed in all positions yet. That is for tomorrow. Then I will start on the ceiling. It turns out to be a nice room.

The builders doing the renovation on Barco and Jeamien's house started last week with the intention of doing the outside first, but  rainy weather forced them to work inside. They have already replaced the whole kitchen and done some plasterboarding. We went over on two days to assist in moving the kitchen contents and the lounge furniture into the garage. The whole family and menagerie has moved over, so we will have a full house, full of grandchildren and full of activity. I even had to build a fence to keep the dogs in.

Sorry, no pictures this week.

No comments:

Post a Comment