Monday

20 May 2013

Just made it!!

The plasterboard in the new kitchen is all up, but not plastered yet.

We had a bit of a lazy week, with people visiting and so on and so forth. (so nice)

It started raining on Thursday ,and I could not go out to get the plasterboard for the ceiling (lame excuse, I know) So we started work on the bathroom vanity. We took it apart, measured the tiles we still needed, and went to town. We could not find a suitable tile for the edging. Eventually we cut some of the 100 mm high wall tiles in half. That will do. The next part of the job will be to sand the whole cabinet down and paint it.

I am wasting time sitting here writing this blog, so, if you will excuse me, I have to get to work.

Bye
13 May 2013

Yes, I know, I am a day late. Sorry!!

We made good progress on the new kitchen. Added studs to correspond with the width of the plasterboard, and added the spacers required to get the thickness right. Then I went to get some more insulation (we had some left over from the last batch) and plasterboard. We managed to fit insulation to all the outside walls. Shaun, the grandson offered his help on Saturday, and we got the outside walls covered from the top (2.4 m). Next will be to do the bottom 1 m. I ran out of plasterboard and will need to get some more.

The inside wall towards the living room does not get covered yet, because we are planning a serving opening.

I also got hold of a backpack weed sprayer. I spent some time fixing it, mounted it on a trolley, and sprayed the weeds in part of the lawn.

This morning I got sidetracked. I resumed work on the storeroom I started some months ago. I had all the shelves already in, but no walls on two sides. I got some rain in my storage containers. It was such a lovely day, I just had to do outside work. I can report that the storeroom is finished now.

I also had to mow the grass. It is still growing, but I hope this will be the last cut before winter. Thank goodness for the ride on. In the meantime Elna is filling holes in the ground from the heap of dirt (earth) that is lying here.

Sunday

5 May 2013

Having worked a whole week, I wonder where my time went?

I have stripped all of the old sarking boards off the new kitchen. That created a lot of dust. Luckily I have borrowed a proper respirator, so it was not too bad.

With the timber removed, we could do a proper clean out. I used four vacuum cleaner bags. I still haven't installed all the wiring. Saturday was spent de-nailing all the boards, and putting them away.

Jaco turned up on Friday, so we worked all day on the frames for his sleep out.

Some time during the week, we also made some time to put up the last of the veranda posts. They go in pairs, and there is supposed to be scrolls between them. That is not done yet. (Oh, I forgot to say, it goes around the corner as well)


It looks much better now, but there is still a lot of work to be done. With the rainy season starting now, it is unlikely that I will be doing much more on the veranda. The deck is another story, that is on the long term list.
Now you can understand why I did the outer beam for the deck long ago. It all fits together now. Sometimes there is still some method in my madness

Well, If you will allow me, I will continue the work in the kitchen next week, with some new studs, insulation and plaster boarding.

Have a nice week!!
28 April 2013

Elna did manage to paint all the posts, but they are not up yet.

I worked on adapting the framing for the new kitchen.We have to provide for installing a second window towards the street (south side). I also had to accommodate the corner pantry which we have in storage. Then Jaco called, he is available and wants to learn more about framing and installing plasterboard. We made some preparations and went out to get plasterboard and started installing it. All went very well, but I had a worry in the back of my mind: is there not something that I have forgotten? The next morning when
I got up, I remembered that I still had  to provide for a light and a wall heater. So I took one of the boards off again. Luckily it was only screwed down.

We went to town and bought a wall heater and a mirror (we did have a lamp in storage). Then I started the intricate task of wiring, with me first drilling the necessary holes through the framing and floor and then crawling under the floor to reroute the existing wiring for plugs. I also had to provide for the other plugs that have to be fitted in the kitchen. All of that took me most of Friday and Saturday.

On Saturday we also went to Hamilton with Jaco to select and buy used timber framing for a room they want to build for his wife for a salon. That is on their front lawn. Got a whole trailer load for $ 100.

I finished my wiring late Saturday night, just as it was getting dark and I was running out of energy. There is still next week to do more work.
21 April 2013

It is officially autumn now. We have had the most severe drought in North Island in the last 70 years, and the whole North Island was declared a drought area. With autumn arriving, we got bits of rain, but not much. The farmers called it a "green drought". The grass was green but with no growth. Luckily, it has changed, we had some rain during the week and today we had about 30 mm so far. This also implies that I will have to start work in inside tasks.

The last of the veranda posts are joined and sanded now, but not painted yet. We will have to wait for a sunny day.

I started work on cutting and removing the old studs between the bathroom and the kitchen to be. Sorry, the place is a mess, I cannot take a picture. That job went well, but it had a complication: I got affected by the dust and developed a sinus infection. It meant that I had to get antibiotics. It also delayed my progress. We also went to help friends with the finishing touches of a unit/flat renovation in Hamilton. We spent two days on that.

Next week we need to replace the hob in our kitchen in the Cambridge house, and that will require some cutting and joining of the bench top.

Well, even with getting older, we never have a spare moment. That is, excluding rest breaks whilst doing a job. But we are not complaining, we are enjoying it.

Let us hope next week will have more to report about
Bye
14 April 2013

I spent a lot of time extending the veranda posts. By last count, we had 7 painted and ready, two in clamps and two more to glue. The others are ready for paint. Progress, but slow. I hope to get all of the posts up before the rainy season starts. The roof will have to wait a while.

I called the plumber on the 11th of March to ask for the new bathroom to be connected. I called again last Friday, and he promised to come back to me this week. On Monday he called: Will Thursday be OK? We had a wedding on that we would not miss, but we could not put the guy off. In the end, we accepted. Because it is very dry and dusty under the floor, I went under and put black plastic sheets down where the guy would work. That implied that I got dusty, instead of him!!.

Thursday morning at eight he turned up, ready to go. Now, we normally only start waking up at eight, but we were up and dressed, and were ready for him. I showed him what I had in mind, and obviously, he had another layout in mind. We left him by himself and attended the wedding at 11 am. We returned about 12:30, skipping the party. He worked all day but didn't finish, so he came back on Friday. He came even earlier, but we were up and ready, but skipped breakfast. He finished at about 11. Now we have the luxury of a bathroom two meters down the passage. I must admit, there is a lot of finishing still to be done, and it was cause for an argument with the boss (what is to be priority), but we can use it in the meantime.

It gave me great pleasure to destroy the old toilet and basin in the old bathroom on the deck!!!(If I took the shower out, the whole structure will collapse)

Well, we have made great progress this week, but none of it is visible, it is all under the floor.The veranda posts are still in the workshop. I hope to fit at least the seven that are ready. Keep in mind the posts go in pairs, 450 mm apart (did I type that correctly?)

Love you all


7 April 2013

This week I managed to fit the 10 posts that were extended last week. It is beginning to take shape, but there is a lot more to be done. There is about another 13 to do. Remember, most of the posts are doubled, 450 mm apart. I asked around and was told of a different epoxy glue, and man, that one works! I can manage two posts per day (with the eight clamps I have). I think, including Saturday's two, I have about seven done now. Still to be sanded and painted.

I called tie plumber on Friday, it is four weeks we have been waiting now, but it seems he is not very interested. I will give him another week, then start the pipework myself.

On Saturday we picked up a fridge/freezer we bought in Hamilton, so half the day was gone. We spent some time today to remove the old fridge and freezer and install the "new" combination unit. We still have a separate smaller freezer.

We are still planning to fit the "new" used hob in Cambridge this coming week. We will have to modify the counter top to accept the smaller hob.

We also had some rain on Saturday, and the weather has suddenly turned. Our forecast for tonight is 5 deg. I think winter has started. Thank goodness we are sleeping in the front room which is insulated.

I am very excited about the patio door frame I need to build for the dining room, but realise I have to be patient till Willie arrives here to advise me.