Sunday

1 September 2013

Well, the firewood has been cut up and the floor removed. some of the flooring is still in a useable condition.

I also patched the floor between the dining and living rooms. I had two rows of boards, running perpendicular to each other. I managed to cut the ends and cut a floor board to fit. It is  nice not to have a piece of old carpet lying there.

There was also one board in the front room that serves as an office that was rotten away. I cut and replaced about one meter of that.

Louis, a friend had some stuff and a vehicle stored with us. Thankfully all was removed. Then I took some time to dump some metal on a metal recycler, and even got some money  for it. That money I used to dump a load of rubbish at the dump.

Week done.

As from Monday we will be working on our Cambridge house, to finish off a room that has been used for storage. We have decided to try and sell the property, and it will sell much easier if that room is finished as a  bedroom. That will mean we might miss on reporting on the Jackson House for some time.